A vertical rib brick structure located in the original masonry wall with new plate of reinforced concrete beams, the original precast hollow slab in the seam on both sides of the open hole section of the wear bars; closed rectangular section are arranged in the new beam stirrups, a new beam longitudinal reinforcement and spaced core hole anchor bars; the the new beam passing through the stirrup reinforcement hole, and through the new masonry structure vertical rib reinforcement and wear cast-in-place reinforced concrete beams in new concrete precast hollow slab and the vertical rib plate and brick concrete structure reinforced concrete beam to form a whole; L core hole anchor bar is end with a hook, a cavity the limb extends into the original precast hollow slab in another leg is bent down and buried concrete masonry structure of ribbed plate vertical new reinforced concrete beam girder; masonry structure vertical slab of reinforced concrete beam is close to the original new precast hollow slab in cavity The end part of the side and the core hole pull anchor steel bar is provided with a plate hole block. The invention effectively solves the technical problem that the original prefabricated hollow floor is lack of integrity.
【技術(shù)實(shí)現(xiàn)步驟摘要】
一種位于原砌體墻處與板肋垂直的磚混結(jié)構(gòu)新增鋼筋砼梁
本技術(shù)涉及一種加固結(jié)構(gòu)中的新增鋼筋混凝土梁,特別是一種原結(jié)構(gòu)為磚混結(jié)構(gòu)的加固結(jié)構(gòu)中的新增鋼筋混凝土梁。
技術(shù)介紹
隨著三十年改革開(kāi)放的不斷深入,我國(guó)經(jīng)濟(jì)社會(huì)得到了迅速發(fā)展,中國(guó)城市化的步伐越來(lái)越快,特別是近幾年來(lái),城市的摩登時(shí)代已經(jīng)到來(lái),高層建筑像雨后春筍,隨處可見(jiàn)。隨著城市的不斷發(fā)展擴(kuò)大,各個(gè)城市中心的土地都開(kāi)始存在稀缺現(xiàn)象。由于歷史的發(fā)展原因,二十世紀(jì)八、九十年代的建筑大多為五或六層,磚體或磚混結(jié)構(gòu),少數(shù)是框架結(jié)構(gòu),抗震能力較差,不能適應(yīng)現(xiàn)代城市發(fā)展和人居的需求。一般在舊城改造中采取“大拆大建”的改造方法,不但縮短建筑壽命,還浪費(fèi)了大量資源,建筑垃圾無(wú)處排放會(huì)對(duì)土地環(huán)境造成嚴(yán)重污染,拆遷還會(huì)引起社會(huì)的不安定。采取不拆除舊有建筑進(jìn)行加層的方法,能夠有效節(jié)能減排,低碳發(fā)展城市,改善居住環(huán)境和品位。但需要采取有效的技術(shù)措施確保加層后建筑結(jié)構(gòu)的安全。在加層改造技術(shù)中存在兩個(gè)重要的技術(shù)難題,一個(gè)是新加結(jié)構(gòu)件與原有結(jié)構(gòu)件之間的可靠連接,另外一個(gè)是設(shè)置加層后,原有結(jié)構(gòu)的強(qiáng)度和抗震性能能否滿足要求,其安全性能能否保證。傳統(tǒng)的鋼筋混凝土板加固墻體節(jié)點(diǎn)在與板肋垂直的原砌體墻處新混凝土 (新增鋼筋混凝土板墻)與舊混凝土 (原預(yù)制空心板)之間無(wú)直接的連接(僅以穿板連接筋從原預(yù)制空心板板端與板肋垂直的原砌體墻之間的空隙穿過(guò),來(lái)連接上、下層新增鋼筋混凝土板墻),或僅靠粘合劑粘結(jié)或鍵槽連接,則在地震荷載作用下原預(yù)制空心板與和板肋垂直的原砌體墻脫離,樓蓋失去整體性,無(wú)法作為一個(gè)整體作用的抗側(cè)力水平樓蓋結(jié)構(gòu)體系來(lái)抵抗水平地震荷 ...
【技術(shù)保護(hù)點(diǎn)】
一種位于原砌體墻處與板肋垂直的磚混結(jié)構(gòu)新增鋼筋砼梁(3),其特征在于:位于原預(yù)制空心板接縫處,且與原預(yù)制空心板的板肋垂直設(shè)置,原預(yù)制空心板在接縫的兩側(cè)開(kāi)有穿筋孔(8);所述與板肋垂直的磚混結(jié)構(gòu)新增鋼筋砼梁(3)為封閉矩形截面,其內(nèi)設(shè)置有新增梁箍筋(9)、新增梁縱向鋼筋(10)以及與間隔設(shè)置的芯孔拉錨鋼筋(12);所述新增梁箍筋(9)穿過(guò)穿筋孔(8),并通過(guò)穿筋孔(8)灌注與板肋垂直的磚混結(jié)構(gòu)新增鋼筋砼梁(3)的混凝土使原預(yù)制空心板和與板肋垂直的磚混結(jié)構(gòu)新增鋼筋砼梁(3)形成整體;所述芯孔拉錨鋼筋(12)為端部帶彎鉤的L型,其一肢伸入原預(yù)制空心板的空腔(1)內(nèi),另一肢向下彎折埋入與板肋垂直的磚混結(jié)構(gòu)新增鋼筋砼梁(3)的梁體混凝土內(nèi);所述原預(yù)制空心板的空腔(1)內(nèi)緊貼板肋垂直的磚混結(jié)構(gòu)新增鋼筋砼梁(3)側(cè)面及芯孔拉錨鋼筋(12)的端部設(shè)置有板孔堵塊(11)。
【技術(shù)特征摘要】
1.一種位于原砌體墻處與板肋垂直的磚混結(jié)構(gòu)新增鋼筋砼梁(3),其特征在于:位于原預(yù)制空心板接縫處,且與原預(yù)制空心板的板肋垂直設(shè)置,原預(yù)制空心板在接縫的兩側(cè)開(kāi)有穿筋孔(8); 所述與板肋垂直的磚混結(jié)構(gòu)新增鋼筋砼梁(3)為封閉矩形截面,其內(nèi)設(shè)置有新增梁箍筋(9)、新增梁縱向鋼筋(10)以及與間隔設(shè)置的芯孔拉錨鋼筋(12); 所述新增梁箍筋(9)穿過(guò)穿筋孔(8),并通過(guò)穿筋孔(8)灌注與板肋垂直的磚混結(jié)構(gòu)新增鋼筋砼梁(3)的混凝土使原預(yù)制空心板和與板肋垂直的磚混結(jié)構(gòu)新增鋼筋砼梁(3)形成整體; 所述芯孔拉錨鋼筋(12)為端部帶彎鉤的L型,其一肢伸入原預(yù)制空心板的空腔(I)內(nèi),另一肢向下彎折埋入與板肋垂直的磚混結(jié)構(gòu)新增鋼筋砼梁(3)的梁體混凝土內(nèi); 所述原預(yù)制空心板的空腔(I)內(nèi)緊貼板肋垂直的磚混結(jié)構(gòu)新增鋼筋砼梁(3)側(cè)面及芯孔拉錨鋼筋(12)的端部設(shè)置有板孔堵塊(11)。2.根據(jù)權(quán)利要求1所述的一種位于原砌體墻處與板肋垂直的磚混結(jié)構(gòu)新增鋼筋砼梁(3)...
【專利技術(shù)屬性】
技術(shù)研發(fā)人員:黃智輝,劉成建,
申請(qǐng)(專利權(quán))人:黃智輝,劉成建,鄞州浙江清華長(zhǎng)三角研究院創(chuàng)新中心,
類型:實(shí)用新型
國(guó)別省市:
還沒(méi)有人留言評(píng)論。發(fā)表了對(duì)其他瀏覽者有用的留言會(huì)獲得科技券。