The invention discloses a system for supporting the construction process, a high-altitude operation platform of steel cable-stayed type steps are as follows: first, construction preparation: determine formwork supporting structure scheme for full frame support, steel platform for the steel platform cable-stayed type; two, high-altitude cable-stayed type steel support platform operation check the bearing capacity of the system; three, the construction of cable-stayed type steel platform construction beam and the beam of cable-stayed construction; four, formwork support structure. The invention has the advantages of simple steps, reasonable design, the use of steel operation platform as the operating platform of steel cable-stayed type, formwork support structure in steel, reduces risk, before construction can be determined through experiments of the elastic deformation and non elastic deformation amount, can pass the reserved deformation to control deflection in support of a n layer of the roof template, to shorten the construction period, and the late decoration engineering construction can provide a favorable operating platform.
【技術(shù)實(shí)現(xiàn)步驟摘要】
一種高空斜拉式型鋼操作平臺(tái)模板支撐體系施工工藝
本專利技術(shù)屬于建筑結(jié)構(gòu)施工
,尤其是涉及一種高空斜拉式型鋼操作平臺(tái)模板支撐體系施工工藝。
技術(shù)介紹
隨著城市建設(shè)的發(fā)展,建筑師們充分發(fā)揮聰明才智相繼涌現(xiàn)出許多造型美觀大方的建筑,為人們帶來了視覺上的沖擊,但也給工程師施工帶來了極大的挑戰(zhàn)。特別是公共建筑常采用高空大懸挑的手法,來滿足造型的需求,例如沿建筑屋面四周設(shè)置大懸挑的鋼結(jié)構(gòu)裝飾物來達(dá)到空曠、通透、視野開闊的建筑效果。公共性建筑物中的自動(dòng)扶梯設(shè)施,通常為中空環(huán)形結(jié)構(gòu),跨越層數(shù)多,空間高度大,頂層結(jié)構(gòu)為混凝土樓板時(shí),其模板支撐體系若自首層搭設(shè)至頂層,架體搭設(shè)高度過大,且根據(jù)《建筑施工扣件式鋼管腳手架安全技術(shù)規(guī)范》JGJ130-2011第6.9.1條滿堂支撐架搭設(shè)高度不宜超過30m及第6.9.7條滿堂支撐架高寬比不應(yīng)大于3,搭設(shè)高度越大,架體穩(wěn)定性越差、操作風(fēng)險(xiǎn)越高。中空環(huán)形結(jié)構(gòu)進(jìn)行施工時(shí),傳統(tǒng)的模板支撐體系采用型鋼平臺(tái)模板支撐體系或懸挑型鋼平臺(tái)模板支撐體系的下部設(shè)型鋼支撐架的方式,主要存在以下不足:1、下部設(shè)型鋼支撐架很難一次搭設(shè)到位,架體搭設(shè)質(zhì)量控制難度較大;2、下部設(shè)型鋼支撐架由于地基的影響、節(jié)點(diǎn)多、扣件滑移、立桿高度高等因素易產(chǎn)生彎曲,使建筑物中的混凝土構(gòu)件的撓曲變形不容易控制;3、下部設(shè)型鋼支撐架由于搭設(shè)高度較高,難度大,工序時(shí)間較長。
技術(shù)實(shí)現(xiàn)思路
本專利技術(shù)所要解決的技術(shù)問題在于針對(duì)上述現(xiàn)有技術(shù)中的不足,一種高空斜拉式型鋼操作平臺(tái)模板支撐體系施工工藝,其方法步驟簡(jiǎn)單、設(shè)計(jì)合理且實(shí)現(xiàn)方便、使用效果好,型鋼操作平臺(tái)作為斜拉式型鋼操作平臺(tái),模板支撐結(jié) ...
【技術(shù)保護(hù)點(diǎn)】
一種高空斜拉式型鋼操作平臺(tái)模板支撐體系施工工藝,其特征在于:高空斜拉式型鋼操作平臺(tái)模板支撐體系包括水平布設(shè)的型鋼操作平臺(tái)和設(shè)置在所述型鋼操作平臺(tái)上方的模板支撐結(jié)構(gòu),所述型鋼操作平臺(tái)固定在主體結(jié)構(gòu)的結(jié)構(gòu)板(2)上,所述主體結(jié)構(gòu)為多層的中空環(huán)形結(jié)構(gòu),所述高空斜拉式型鋼操作平臺(tái)模板支撐體系用于支撐所述中空環(huán)形結(jié)構(gòu)第n層的頂板(9)和用于將所述頂板(9)的混凝土澆筑成形的模板(10),其中,n為正整數(shù)且n≥4;對(duì)所述高空斜拉式型鋼操作平臺(tái)模板支撐體系進(jìn)行施工時(shí),過程如下:步驟一、施工準(zhǔn)備:對(duì)所述模板支撐結(jié)構(gòu)和所述型鋼操作平臺(tái)方案進(jìn)行確定,所述模板支撐結(jié)構(gòu)為滿堂支撐架(4),所述型鋼操作平臺(tái)為斜拉式型鋼操作平臺(tái)(3);所述斜拉式型鋼操作平臺(tái)(3)由多根依次布設(shè)在第n?2層所述結(jié)構(gòu)板(2)上的型鋼梁(3?1)搭建而成,同時(shí),在所述中空環(huán)形結(jié)構(gòu)第n?1層縱向的邊梁(1)上預(yù)埋多個(gè)預(yù)埋吊環(huán)(6),所述型鋼梁(3?1)通過鋼絲繩(5)與所述中空環(huán)形結(jié)構(gòu)第n?1層的邊梁(1)連接,所述鋼絲繩(5)的一端與所述預(yù)埋吊環(huán)(6)連接,所述鋼絲繩(5)的另一端與所述型鋼梁(3?1)連接;步驟二、高空斜拉式型鋼操作 ...
【技術(shù)特征摘要】
1.一種高空斜拉式型鋼操作平臺(tái)模板支撐體系施工工藝,其特征在于:高空斜拉式型鋼操作平臺(tái)模板支撐體系包括水平布設(shè)的型鋼操作平臺(tái)和設(shè)置在所述型鋼操作平臺(tái)上方的模板支撐結(jié)構(gòu),所述型鋼操作平臺(tái)固定在主體結(jié)構(gòu)的結(jié)構(gòu)板(2)上,所述主體結(jié)構(gòu)為多層的中空環(huán)形結(jié)構(gòu),所述高空斜拉式型鋼操作平臺(tái)模板支撐體系用于支撐所述中空環(huán)形結(jié)構(gòu)第n層的頂板(9)和用于將所述頂板(9)的混凝土澆筑成形的模板(10),其中,n為正整數(shù)且n≥4;對(duì)所述高空斜拉式型鋼操作平臺(tái)模板支撐體系進(jìn)行施工時(shí),過程如下:步驟一、施工準(zhǔn)備:對(duì)所述模板支撐結(jié)構(gòu)和所述型鋼操作平臺(tái)方案進(jìn)行確定,所述模板支撐結(jié)構(gòu)為滿堂支撐架(4),所述型鋼操作平臺(tái)為斜拉式型鋼操作平臺(tái)(3);所述斜拉式型鋼操作平臺(tái)(3)由多根依次布設(shè)在第n-2層所述結(jié)構(gòu)板(2)上的型鋼梁(3-1)搭建而成,同時(shí),在所述中空環(huán)形結(jié)構(gòu)第n-1層縱向的邊梁(1)上預(yù)埋多個(gè)預(yù)埋吊環(huán)(6),所述型鋼梁(3-1)通過鋼絲繩(5)與所述中空環(huán)形結(jié)構(gòu)第n-1層的邊梁(1)連接,所述鋼絲繩(5)的一端與所述預(yù)埋吊環(huán)(6)連接,所述鋼絲繩(5)的另一端與所述型鋼梁(3-1)連接;步驟二、高空斜拉式型鋼操作平臺(tái)模板支撐體系承載力的驗(yàn)算:根據(jù)步驟一中確定的所述模板支撐結(jié)構(gòu)的方案,確定所述型鋼操作平臺(tái)上部的荷載值,根據(jù)確定的所述型鋼操作平臺(tái)上部的荷載值,同時(shí)結(jié)合步驟一確定的所述型鋼操作平臺(tái)的方案,驗(yàn)算所述型鋼操作平臺(tái)的承載力;步驟三、斜拉式型鋼操作平臺(tái)的施工,包括以下過程:步驟301、型鋼梁的施工:將多根所述型鋼梁(3-1)依次沿所述結(jié)構(gòu)板(2)的縱向水平布設(shè),所述型鋼梁(3-1)為橫向設(shè)置,將所述型鋼梁(3-1)的兩端分別與所述結(jié)構(gòu)板(2)進(jìn)行錨固;多根所述型鋼梁(3-1)設(shè)置的位置與所述預(yù)埋吊環(huán)(6)的位置相對(duì)應(yīng);步驟302、對(duì)所述型鋼梁進(jìn)行斜拉:在每根所述型鋼梁(3-1)上沿所述型鋼梁(3-1)長度方向?qū)ΨQ設(shè)置多組連接件,將所述鋼絲繩(5)的一端固定連接在所述預(yù)埋吊環(huán)(6)上后,再將所述鋼絲繩(5)的另一端固定連接在所述連接件上;步驟四、模板支撐結(jié)構(gòu)的施工:將滿堂支撐架(4)中的立桿(4-1)的底部沿豎直方向固定...
【專利技術(shù)屬性】
技術(shù)研發(fā)人員:白皓,劉東,林青山,何雙紅,青超,吳振國,左大鵬,王濤,曹剛,夏坤,沈強(qiáng),王博,李攀,
申請(qǐng)(專利權(quán))人:陜西建工第十建設(shè)集團(tuán)有限公司,
類型:發(fā)明
國別省市:陜西,61
還沒有人留言評(píng)論。發(fā)表了對(duì)其他瀏覽者有用的留言會(huì)獲得科技券。