The invention provides a multi rib three direction prestressed precast trough reinforced installation rack, main tank located on both sides, and the main body is provided with a plurality of vertical beam hole bench in the main tank, the formation of secondary beam installation area bench between sub beam bench hole; both ends of the trough girder depth is greater than the middle the depth, near the end of the trough girder ends with reinforced groove, groove depth is greater than the end part of the reinforced beam bench hole depth. The installation sequence of primary and secondary beams shall be secondary beam, main girder, side wall, bottom plate and overall transfer. The installation method of the invention is matched with a special steel bar mounting platform, which greatly improves the construction efficiency of the multi rib three direction prestressed prefabricated groove body and speeds up the project progress. The device and the method of the invention realizes the single frame body girder, secondary beam large special-shaped structure reinforced within 96 hours of rapid and efficient completion of installation, with the next working process conditions, shorten the aqueduct construction time.
【技術(shù)實現(xiàn)步驟摘要】
多肋三向預(yù)應(yīng)力預(yù)制槽身鋼筋安裝臺架及安裝方法
本專利技術(shù)涉及多肋預(yù)應(yīng)力渡槽施工
,特別是一種多肋三向預(yù)應(yīng)力預(yù)制槽身鋼筋安裝臺架及安裝方法。
技術(shù)介紹
近年來,隨著起重技術(shù)的飛速發(fā)展,超大噸位的工程起重設(shè)備已在大型水利渡槽工程建設(shè)中得到了廣泛的應(yīng)用,因此渡槽施工技術(shù)也衍生出了新的發(fā)展方向,工廠化標(biāo)準(zhǔn)化預(yù)制渡槽工藝得到了一定的發(fā)展。由于線型水利工程在進(jìn)度上受渡槽預(yù)制構(gòu)件的預(yù)制速度影響較大,常規(guī)方法在倉位上現(xiàn)場綁扎鋼筋的工藝直接將槽身鋼筋綁扎工序安排在了工程的關(guān)鍵施工線路上,且多肋結(jié)構(gòu)模板復(fù)雜,安裝困難,若與鋼筋安裝工序交替施工,相互之間必然會產(chǎn)生施工干擾,對槽身的施工進(jìn)度產(chǎn)生較大影響。因此,研究新的裝置,創(chuàng)新安裝方法,將預(yù)制槽身的鋼筋調(diào)整至與槽身模板同步施工或者提前完成槽身鋼筋的安裝,待模板就位后可立即吊裝入模的方法有助于加快工程進(jìn)度。例如某水利工程采用了槽身預(yù)制施工工藝,單槽橫斷面尺寸:內(nèi)輪廓6.5m×5.0m(凈寬×凈高),外輪廓8.7m×7.1~6.6m,底板厚0.4m,邊墻厚度為0.5m,空槽重量約1200t。渡槽采用了矩形預(yù)制渡槽,結(jié)構(gòu)為多肋,分別在底板以下設(shè)置了15條次梁、次梁鋼筋深入主梁內(nèi)1m,主梁分布在槽身的左右兩側(cè),主梁寬1.2m,高2.1m,槽身側(cè)墻外立面設(shè)置有13條側(cè)肋,因結(jié)構(gòu)在橫向、縱向、豎向均設(shè)置了預(yù)應(yīng)力錨束,縱向、橫向預(yù)應(yīng)力采用fptk=1860kPa級鋼絞線,豎向預(yù)應(yīng)力采用PSB1080·ΦPS32精軋螺紋預(yù)應(yīng)力鋼筋,結(jié)構(gòu)鋼筋和預(yù)應(yīng)力筋密集,交錯布置,預(yù)應(yīng)力筋和普通鋼筋的安裝精度要求高,定位難度大。
技術(shù)實現(xiàn)思路
本專利技術(shù)所要 ...
【技術(shù)保護點】
一種多肋三向預(yù)應(yīng)力預(yù)制槽身鋼筋安裝臺架,其特征是:主梁槽體(1)位于兩側(cè),在主梁槽體(1)之間設(shè)有多個與主梁槽體(1)垂直的次梁臺架孔(6),各個次梁臺架孔(6)之間形成次梁安裝區(qū)臺架(2);主梁槽體(1)兩端的深度大于中間的深度,靠近主梁槽體(1)兩端還設(shè)有端部鋼筋槽(9),端部鋼筋槽(9)的深度大于次梁臺架孔(6)的深度。
【技術(shù)特征摘要】
1.一種多肋三向預(yù)應(yīng)力預(yù)制槽身鋼筋安裝臺架,其特征是:主梁槽體(1)位于兩側(cè),在主梁槽體(1)之間設(shè)有多個與主梁槽體(1)垂直的次梁臺架孔(6),各個次梁臺架孔(6)之間形成次梁安裝區(qū)臺架(2);主梁槽體(1)兩端的深度大于中間的深度,靠近主梁槽體(1)兩端還設(shè)有端部鋼筋槽(9),端部鋼筋槽(9)的深度大于次梁臺架孔(6)的深度。2.根據(jù)權(quán)利要求1所述的一種多肋三向預(yù)應(yīng)力預(yù)制槽身鋼筋安裝臺架,其特征是:端部鋼筋槽(9)的寬度大于次梁臺架孔(6)的寬度。3.根據(jù)權(quán)利要求1所述的一種多肋三向預(yù)應(yīng)力預(yù)制槽身鋼筋安裝臺架,其特征是:主梁槽體(1)、次梁臺架孔(6)和端部鋼筋槽(9)均位于地面(11)以下。4.根據(jù)權(quán)利要求1所述的一種多肋三向預(yù)應(yīng)力預(yù)制槽身鋼筋安裝臺架,其特征是:在主梁槽體(1)的兩端底部設(shè)有集水坑(8)。5.根據(jù)權(quán)利要求1所述的一種多肋三向預(yù)應(yīng)力預(yù)制槽身鋼筋安裝臺架,其特征是:在次梁安裝區(qū)臺架(2)的頂部設(shè)有沿水平布置的橫向高程控制支架(3),在主梁槽體(1)的底部設(shè)有沿水平布置的縱向高程控制支架(4),在主梁槽體(1)靠近外側(cè)壁的位置設(shè)有豎直布置的側(cè)墻鋼筋固定支架(5)。6.根據(jù)權(quán)利要求5所述的一種多肋三向預(yù)應(yīng)力預(yù)制槽身鋼筋安裝臺架,其特征是:在每個主梁槽體(1)內(nèi)的側(cè)墻鋼筋固定支架(5)為兩列。7.根據(jù)權(quán)利要求1所述的一種多肋三向預(yù)應(yīng)力預(yù)制槽身鋼筋安裝臺架,其特征是:次梁臺架孔(6)和端部鋼筋槽(9)的側(cè)壁設(shè)有磚砌層(12),磚砌層(12)的表面設(shè)有砂漿抹面層(13);主梁槽體(1)、次梁臺架孔(6)和端部鋼筋槽(9)的底部設(shè)有混凝土層(1...