The new grinding device, the invention discloses a blast furnace tuyere sleeve hole drill rig, including drill is arranged on one side of the fixed frame, the fixed frame is arranged on the pulley, and the pulley is fixedly connected with the drill rig are respectively arranged on both sides of the first and second electric hydraulic electrohydraulic push rod, the electrohydraulic push rod are respectively provided with electricity hydraulic cylinder and electric hydraulic piston rod, the structure of the invention has the advantages of simple principle, flexible operation, simple and reliable, can achieve arbitrary drill hole in the reciprocating motion.
【技術實現步驟摘要】
本專利技術涉及修磨裝置
,具體為一種高爐風口中套洞口的新型修磨裝置。
技術介紹
高爐中套因長期在高溫環境下使用,容易變形損壞,所以要對其進行定期更換。中套拆下后,其洞口因變形鼓包需要修復,否則影響新中套的準確安裝。目前洞口修復采用人工方式進行或用火燒,這兩種方式修復后的洞口表面凹凸不平且粗糙不均勻,新中套在安裝時還要予以固定,并進行灌漿處理,整個過程非常耗時耗工,極大地增加休風狀態的運行成本和檢修時間,且高爐的工作環境惡劣,使操作工人的勞動強度增大,中國專利號“201220320698.1”,公開了“高爐風口中套洞口的修磨裝置”專利,該專利只有鉆機部分,當磨頭向洞口推進,進行往復磨削時,需要另配10T鏟車輸送,鏟車體積大,操作困難,因局限于現場空間,有時鏟車根本無法進入。
技術實現思路
本專利技術的目的在于提供一種高爐風口中套洞口的新型修磨裝置,以解決上述
技術介紹
中提出的問題。為實現上述目的,本專利技術提供如下技術方案:一種高爐風口中套洞口的新型修磨裝置,包括鉆機,所述鉆機一側設置固定機架,所述固定機架上設置滑輪組,且所述滑輪組固定連接鉆機,所述鉆機兩側還分別設置第一電液推桿和第二電液推桿。優選的,所述第一電液推桿上分別設有第一電液推桿缸體和第一電液推桿活塞桿,所述第一電液推桿缸體連接第一電液推桿缸體連接座,所述第一電液推桿缸體連接座連接固定機架;所述第一電液推桿活塞桿連接第一電液推桿活塞桿連接板,所述第一電液推桿活塞桿連接板連接鉆機。優選的,所述第二電液推桿上分別設有第二電液推桿缸體和第二電液推桿活塞桿,所述第二電液推桿缸體連接第二電液推桿缸體連接座 ...
【技術保護點】
一種高爐風口中套洞口的新型修磨裝置,?包括鉆機(1),其特征在于:所述鉆機(1)一側設置固定機架(2),所述固定機架(2)上設置滑輪組(3),且所述滑輪組(3)固定連接鉆機(1),所述鉆機(1)兩側還分別設置第一電液推桿(4)和第二電液推桿(5)。
【技術特征摘要】
1.一種高爐風口中套洞口的新型修磨裝置,包括鉆機(1),其特征在于:所述鉆機(1)一側設置固定機架(2),所述固定機架(2)上設置滑輪組(3),且所述滑輪組(3)固定連接鉆機(1),所述鉆機(1)兩側還分別設置第一電液推桿(4)和第二電液推桿(5)。2.根據權利要求1所述的一種高爐風口中套洞口的新型修磨裝置,其特征在于:所述第一電液推桿(4)上分別設有第一電液推桿缸體(6)和第一電液推桿活塞桿(7),所述第一電液推桿缸體(6)連接第一電液推桿缸體連接座(8),所述第一電液推桿缸體連接座(8)連接固定機架(2...
【專利技術屬性】
技術研發人員:丁暉,吳立奇,
申請(專利權)人:馬鞍山市中天機械制造安裝有限公司,
類型:發明
國別省市:安徽;34